Metodology and workplan
The work plan of the project is organized into 8 work packages (WP):
WP1 and WP8 are transversal WPs that will ensure the proper coordination of the project and the maximisation of the impact of the project results over society. WP2 will develop future weather files based on climate projections. In addition, it will determine the Resilience Key Performance Indicators to assess the performance of the WEF4Build concepts in buildings. WP3 will develop the rooftop WEF solutions and will determine the reference buildings to assess the impact of the proposed solutions. WP4, WP5 and WP6 will define, analyse and model the WEF4Build concepts in the water, food and energy domains. Finally, in WP7, WEF4Build concepts and strategies will be analysed from the viability, social acceptance and sustainability points of view.
Share: